UPDATE 2 Monday 5 April 2021, 10:30am
JULIUS DAM is at 98.9% capacity and no longer spilling excess water.
The dam access road remains closed.
If you are downstream of the dam, continue to avoid potential hazards and remember if it’s flooded, forget it.
A further update will be issued if further rainfall in the catchment cause flows to increase.
UPDATE 1: Monday 15 March 2021, 07:21pm
Julius Dam is at 99.5% capacity and spilling excess water.
If downstream of the dam, expect increased river flows and remember if it’s flooded, forget it.
Stay informed by:
- downloading the Sunwater App
- following Sunwater on Facebook and Twitter
- tuning into ABC local Radio
- monitoring forecasts and river levels at www.bom.gov.au
- checking the dam’s level at bit.ly/JuliusStorageLevels