Callide Dam Gates Project

Sunwater has completed on-site works as part of the Callide Dam Gates Project. On-site works as part of the project included strengthening each gate structure, upgrading the gate control system and replacing gate seals. Sunwater is finalising documentation to return the dam to its pre-project full supply level with approval of these documents expected to […]

Read More…

Coolmunda Dam – Spill Event

Coolmunda Dam

Update 7 – 7 November 2022, 1.00pm Coolmunda Dam is at 101% and gates are now closed. Minor valve releases are continuing.An update will be issued if further rainfall in the catchment cause flows to increase.For dam level updates, visit https://bit.ly/CoolmundaStorageLevels. Update 6 – 22 October 2022, 11.00am Coolmunda Dam is at 103.51% and has commenced minor outflows through […]

Read More…

Bjelke-Petersen Dam – spill event

Update 6 – Monday, 7 November 2022, 11:15am Bjelke-Petersen Dam is at 101% and outflows are decreasing. If downstream of the dam, expect continued river flows and remember if it’s flooded, forget it. Stay informed by: downloading Sunwater’s App following Sunwater on Facebook and Twitter checking the the North and South Burnett Regional Council Disaster Dashboard here emergency.northburnett.qld.gov.au […]

Read More…

Update: Glenlyon Dam residents and visitors advised to bring potable water

Glenlyon Dam

Update 3: 27 October 2022. 3:50pm This update applies to all residents and visitors to Glenlyon Dam who receive treated water from the Glenlyon Dam Water supply.The advice to not use the tap (potable) water from the Glenlyon Dam water supply for drinking, cooking, or brushing teeth is now lifted. Residents and visitors can now […]

Read More…