skip to main content skip to navigation

 

Announced Allocations

Pioneer River Water Supply Scheme

Water Year: 2018/2019

High Priority A Water Allocations: 100%
High Priority B Water Allocations: 100%

Announced Allocations effective 1 July 2018, and will be applicable until 30 June 2019.

Customers are advised to obtain information about their remaining water allocation balance by accessing SunWaterOnline.

For more information or enquiries, phone 13 15 89 or email customersupport@sunwater.com.au.

Pioneer River - Announced Allocation History Pioneer River - Announced Allocation History (352 KB)

Pioneer River - Start of Water Year Announced Allocation Prediction Graph Pioneer River - Start of Water Year Announced Allocation Prediction Graph (102 KB)

Operational Reports

Pioneer River - Operational Report (effective 1 July 2018) Pioneer River - Operational Report (effective 1 July 2018) (375 KB)

Pioneer River - Operational Report (effective 1 July 2017) Pioneer River - Operational Report (effective 1 July 2017) (82 KB)

Pioneer River - Operational Report (effective 1 July 2016) Pioneer River - Operational Report (effective 1 July 2016) (82 KB)

Pioneer River - Operational Report (effective 1 July 2015) Pioneer River - Operational Report (effective 1 July 2015) (35 KB)

Streamflow Availability

pdf icon You require Adobe Acrobat Reader to view or print PDF documents

Please note that the availability of streamflow as per Section 102 of the Pioneer ROP effective January 2016:

Zone

Streamflow Access

Cattle01, Cattle02, Silver/McGregor01

Not Available

Pioneer01, Pioneer02, Pioneer03, Bakers01

Not Available

Pioneer04

Not Available

Teemburra Dam Water Level Classification

As required under s101A(2)(c) of the Pioneer Valley ROP (January 2016):

Teemburra Dam Storage Level

Stage

Effective Date

289.78m AHD

1

1 July 2018

289.58m AHD

1

1 August 2018

289.15m AHD

1

1 September 2018

288.68m AHD

1

1 October 2018

288.26m AHD

1

1 November 2018